Dashboard
Machine 1 - Hiralal Mehta
Add Cutting Entry
Wire Information
Tap a grade first
Dimensions
Coil Information
Total: 0.0 kg (0 coils)
Job Start
START TIME
Scrap β This Entry
Weight against a reason β blank counts as 0. Goes to the Scrap Checker with this entry.
| Sr. No. | Reason | Wt. (kg) |
|---|---|---|
| Total Scrap | 0.0 kg | |
Output Weight: 0.0 kg
(coil input β total scrap, saved with the entry)
Job End
END TIME
Duration (auto): β
Additional Notes
QC Review β All Entries
| # | Date | Machine | Operator | Voucher No | Wire Type | Heat No. | Dia (mm) | Length (mm) | Weight (kg) | Box | Time | Duration | Notes | Status | Action |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Loading⦠| |||||||||||||||
Scrap Verification & Collection β Machine-wise Daily
Loadingβ¦
End Shift
Shift Summary
Shift Date:
β
β
Entries Today: 0 |
Total Coil Weight: 0 kg
Downtime / Loss Details β Whole Day
Tap +10 β first tap 10, every tap adds 10. Or type minutes. Blank = no loss.
Required before ending the shift.
| Reason | Min. | Reason | Min. | Breakdown Reason | Min. |
|---|---|---|---|---|---|
| Total Shift Time | β | Total Loss Time | 0:00 | Actual Production Time | β |
Shift Notes
βΉοΈ When you press END SHIFT, a signature box will pop up β sign there to confirm and submit your shift.
βΉοΈ
Date: 15/08/2026 | Time:
Today's Production Overview
π΅ MACHINE 1
Operator: Hiralal Mehta
Status:
Entries: 12
Weight: 356 kg
Pass Rate: 91.67% β
π΅ MACHINE 2
Operator: Rajesh Kumar
Status:
Entries: 8
Weight: 245 kg
Pass Rate: 100% β
π’ MACHINE 3
Operator: Amit Sharma
Status:
Entries: 15
Weight: 378 kg
Pass Rate: 93.33% β
Pending Approvals (Need Your Action)
| Machine | Operator | End Time | Entries | Pass Rate | Actions |
|---|---|---|---|---|---|
| Machine 1 | Hiralal | 20:30 | 12 | 91.67% | |
| Machine 3 | Amit | 20:25 | 15 | 93.33% |
Quality Issues This Week
π΄ Machine 1: 1 scratch found (15/08/2026)
π’ Machine 2: No issues reported
π‘ Machine 3: 2 length failures (14/08/2026)
Performance Comparison (Last 7 Days)
Quality Pass Rate by Machine
Machine 1:
92%
Machine 2: (Best Performance)
98%
Machine 3:
90%
Efficiency (Cuts per Hour)
Machine 1:
0.96
Machine 2:
0.75
Machine 3: (Most Productive)
1.05